top of page

GREENFIELDS SCHOOL

LEATHERHEAD, SURREY

Hampshire Brickwork were appointed as the brickwork contractor to undertake the masonry package for a brand-new education building for Greenfield School in Woking, Surrey.

The large build, scaling 2,492 sq. m, will be delivered using modern methods of construction in just 43 weeks and will feature dining, teaching and sports facilities. Darwin Group will also be looking after landscaping works around the site.

The construction of Greenfield School has resulted in a cost-effective, but high-quality approach. The brand-new build has been designed to be practical, as well as eye-catching, with large floor-to-ceiling windows to create a spacious learning environment with plenty of natural daylight.

CONTACT

0118 328 2828

Winton House, Winton Square

Basingstoke RG21 8EN

LOCATIONS

HAMPSHIRE

BERKSHIRE

WILTSHIRE

SURREY

POLICIES

ENVIRONMENTAL POLICY

H&S POLICY

DRUGS & ALCOHOL POLICY

FIRE POLICY

  • Grey LinkedIn Icon
  • Grey Twitter Icon
  • Grey Facebook Icon

SERVICES

HERITAGE & PERIOD BRICKWORK

CONSERVATION

RESTORATION

COMMERCIAL

EDUCATION

HEALTHCARE

Bronze_RGB.png

All Rights Reserved    |    Copyright 2024   |    Website designed by Black Sheep Creative

bottom of page